“Issues And Required Improvements Related To Feedback Operation After Ls1”. Architectural Review of the LHC Orbit & Tune Feedback: CERN, 2013. doi:SOURCE.
. “Lhc Beam-Based Feedback Architecture”. Architectural Review of the LHC Orbit & Tune Feedback: CERN, 2013. doi:SOURCE.
. “Lhc Beam-Beam Compensator Prototype – Update”. HiLumi Technical Committee: CERN, 2013. doi:SOURCE.
. “Lhc Beam-Beam Compensator – Status Update”. Daresburry, UK: 3 rd HiLumi LHC-LARP Annual Meeting, 2013. doi:SOURCE.
. “Lhc Beam-Beam Compensator – Status Update”. 7th HL-LHC Parameter and Layout Committee meeting: CERN, 2013. doi:SOURCE.
. “Specific Orbit- And Q/q'-Feedback Architecture”. Architectural Review of the LHC Orbit & Tune Feedback: CERN, 2013. doi:SOURCE.
. “End-Of-Year Lhc Beam-Based Feedbacks Software Overview”. BI Technical Board: CERN, 2012. doi:SOURCE.
. “Lhc Beam-Beam Compensator Status And Prototype Specification”. BBC Review: CERN, 2012. doi:SOURCE.
. “Lhc Beam-Beam Compensator - Required Resources And Time Estimates”. internal review: CERN, 2011. doi:
. “Lhc Beam-Beam Compensator - Status Summary And Preliminary Specification”. internal review: CERN, 2011. doi:SOURCE.
. “Lhc Base-Band-Tune (Bbq) And Q' Measurement Systems”. CERN, 2008. doi:
. “Lhc (Beam 2) Commissioning - Bpm, Q, Q' Instrumentation And Diagnostics”. Machine Advisory Committee: CERN, 2008. doi:SOURCE.
. “Lhc (Beam 2) Commissioning Status - Bpm, Q, Q' Instrumentation And Diagnostics”. LHC Commissioning Meeting: CERN, 2008. doi:SOURCE.
. “Lhc Tune And Chromaticity Diagnostic And Feedback Control Systems”. LTC - LHC Technical Committee: CERN, 2008. doi:SOURCE.
. “On The Feasibility Of (Semi-) Automated Tune Control In The Ps”. Accelerator Performance Committee: CERN, 2007. doi:SOURCE.
. “Overview Of Foreseen Feedbacks And Implications For Commissioning”. LHC Commissioning Working Group: CERN, 2007. doi:
. “Feedback Architecture And Commissioning At The Lhc”. Tune Feedback Final Design Review: Brookhaven National Laboratory, 2006. doi:SOURCE.
. “Feed-Forward/feedback Required”. Chamonix XV: CERN, 2006. doi:SOURCE.
. “First Results Of The Pll Tune Tracking In The Sps”. Tune Feedback Final Design Review: Brookhaven National Laboratory, 2006. doi:SOURCE.
. “Overview Of Foreseen Feedbacks And Implications For Commissioning”. LHC Commissioning Working Group: CERN, 2005. doi:SOURCE.
.